About

Built by the people the delay was happening to.

PermitX did not start as a software idea. It started with a designer, a builder and a marketer separately losing months to the same queue, and noticing that every comment letter they ever received was about something already drawn on the sheets.

Vaughan, OntarioBuilt with Quotograph

Why it exists

Nobody quotes for the wait.

06 weeks

The line nobody puts on a quote, and usually the one that decides whether the job made money.

You can price materials, labour, consultants and financing. Nobody puts a line on a quote for the six weeks a resubmission adds, because nobody knows in advance whether it will happen.

What made it worth building was realising the failures were repetitive. Not exotic code interpretations, but setbacks, exits, occupant load, barrier free clearances and dimensions that were never shown. The same short list, over and over, across firms and municipalities.

A list that repeats is a list you can check. So we built the thing that reads a drawing set against the code and the bylaw and hands you that list before you file, when a finding still costs an afternoon instead of a season.

Our mission

Accelerating construction through smarter permitting.

Built for the people who build the world. Not for the software industry, and not for a procurement committee. For the designer whose client has already booked the trades, the builder carrying the loan through the wait, and the plans examiner working through a queue that is mostly avoidable errors.

Every hour a finished set spends in a queue is an hour nobody in that list gets back. Say goodbye to the delays, the red tape and the guesswork: that is the whole of the ambition, and it is why the product is a reading machine rather than another form to fill in.

Two people leaning over a large drawing spread out on a table in an office, one of them pointing at a detail on the sheet.
The people Who the product is actually for

Operational excellence

A named person answers

Three people build this and one of them replies. There is no ticket queue between you and someone who can change the product.

Coverage is dated, not promised

Every municipality we have read is listed with what was read. Nothing appears on the coverage page before the bylaw is in the system.

Findings are auditable

Each item cites the article it came from and the sheet it was read off, so a reviewer can check us without taking our word for anything.

How we build it

Four rules we hold ourselves to.

01

The information was always there

Nearly every finding on a comment letter was visible in the drawings before they were filed. Permitting delay is not an information problem, it is a timing problem, and timing problems are solvable.

02

A citation or it did not happen

A compliance tool that says something looks wrong without saying which clause is just anxiety. Every finding names the article it comes from, so you can check our work.

03

Say what you do not cover

We name every municipality whose bylaw we have read in full and we say plainly that everywhere else in Ontario is provincial code only for now. Overstating coverage is how you lose a department’s trust once and permanently.

04

The city is not the opponent

Reviewers are not the reason permits take time. Incomplete applications are. Building a tool that makes intake cleaner helps both sides of the counter, which is why municipalities are an audience and not a target.

Who is building it

Three people who have all been on the wrong side of a comment letter.

Fayaz, Founder of PermitX

Founder

Fayaz

Came up through marketing, interior design and millwork production, and got tired of watching finished designs wait on paperwork. Works on the compliance and analytics side of the platform.

Jen Aram, Co founder of PermitX

Co founder

Jen Aram

Architectural designer with more than fifteen years in design build. Has filed the applications, sat through the review comments, and shaped what the report needs to say.

Alex, Co founder of PermitX

Co founder

Alex

Builder and developer with over twenty years on site. Joined because permitting delay is the cost nobody quotes for, and wanted the tool to put builders first.

The platform

PermitX is delivered through Quotograph.

Quotograph builds the platform PermitX runs on: the workspace that already reads, holds and keeps a record of a project's drawings. The compliance review is a layer on top of that, which is why there is no separate PermitX app to sign up for.

Based in
231 Millway Ave, Vaughan ON, Canada
Coverage
All 444 municipalities in Ontario, with zoning loaded in full on request. Canada and the United States next

Press and media

PermitX in the news, when there is news.

We would rather leave this empty than pad it. If you are writing about permitting delay, municipal review backlogs or construction technology in Ontario, we will talk on the record and show you a real review on a real set.

Media enquiries

Founders available. Screenshots and figures on request.

See whether it finds anything in your set.

That is the only test that settles it. Upload a drawing set in Quoto Build and read what comes back.